Meet Asha Packaging
Running case: Asha Packaging Pvt Ltd. The company proposes a new packing line costing ₹50 lakh today. It expects incremental, after-tax operating cash inflows of ₹15 lakh, ₹18 lakh, ₹20 lakh and ₹16 lakh at the ends of years 1 to 4. At the end of year 4, it also expects ₹5 lakh salvage proceeds and ₹4 lakh recovery of working capital, so the final cash inflow becomes ₹25 lakh. The discount rate for the illustrative project is 12% per year. Figures are hypothetical, in ₹ lakh, and the timing assumption is end-of-year unless otherwise stated.
All figures are hypothetical and expressed in ₹ lakh unless stated otherwise.
01. Why capital investment decisions matter
A bank branch buys a cash recycler, a factory installs a machine, and a trader builds a warehouse. All three pay money today to receive benefits over several years. This is a capital investment decision: the outlay is usually substantial, difficult to reverse and exposed to future uncertainty. The question is not simply whether sales will rise; it is whether the incremental cash generated compensates for the initial cost, risk and time value of money. A bank assessing a term-loan proposal must also ask a different question: even if the investment creates value, will cash arrive on the dates instalments fall due? These two decisions are connected but not interchangeable. A project may have positive NPV and still experience a liquidity crunch in a particular quarter. Conversely, a borrower may be able to service a loan for a short period even when the project destroys economic value.
Think of a small bakery replacing its oven. The old oven still works, so the decision is not about total bakery sales. It is about the extra sales, saved electricity, reduced wastage, extra maintenance, taxes and eventual disposal proceeds attributable to the replacement. This is why project appraisal is an exercise in incremental cash flow rather than a simple accounting-profit comparison.
02. Identify the initial investment
The initial investment includes purchase price, freight, installation, testing, necessary site preparation and additional net working capital required to operate the project. Proceeds from disposing of a replaced asset, after relevant taxes, may reduce the initial net outlay. Sunk costs (money irreversibly spent before the decision) are not relevant to choosing between future alternatives. Opportunity costs are relevant: if the firm uses a building that could otherwise be rented, the forgone rental benefit is an economic cost. Do not confuse the loan amount with project cost: a ₹50-lakh machine may be financed partly by promoter equity and partly by debt, but the project cash-flow appraisal still starts with the entire relevant investment.
For Asha Packaging, assume ₹46 lakh of machinery and installation plus ₹4 lakh additional working capital. The initial project cash flow is therefore −₹50 lakh at time zero. A cash outflow is written as negative, not because the project is necessarily bad, but because cash leaves the business at that point.
03. Operating cash flow versus accounting profit
Accounting profit includes non-cash charges such as depreciation. A capital budgeting model normally focuses on incremental after-tax cash flow. A simplified unlevered operating cash flow can be expressed as EBIT × (1 − tax rate) + depreciation − capital expenditure − increase in net working capital, with care not to double-count initial investment or terminal recoveries. Depreciation itself does not consume cash in the year it is recorded, but it may reduce taxable income and thereby create a depreciation tax shield.
For example, if incremental EBIT is ₹10 lakh, tax is 30%, and depreciation is ₹4 lakh, simplified operating cash flow before new investment or working-capital changes is ₹10 × 0.70 + ₹4 = ₹11 lakh. The figure differs from after-tax accounting profit of ₹7 lakh because depreciation is added back. If the business must build another ₹2 lakh of inventory, cash available from the project drops to ₹9 lakh. In actual appraisal, account for cash taxes, maintenance capital expenditure, receivables, inventory, payables, and project-specific timing.
04. Read a project cash-flow timeline
A timeline prevents many calculation mistakes. Put the initial investment at t = 0, year-one cash flow at t = 1, and so on. An amount received today does not require discounting. A year-three receipt is discounted for three periods, not two. The time period of the discount rate must match the time period of the cash flows: monthly cash flows require a consistent monthly rate, while annual flows use an annual rate.
For Asha Packaging, the timeline is −50, +15, +18, +20, +25 in ₹ lakh. The final ₹25 lakh includes year-four operating inflow of ₹16 lakh, salvage of ₹5 lakh and working-capital recovery of ₹4 lakh. If the final ₹9 lakh is omitted, NPV will be understated. If it is added twice, NPV will be overstated. The animated timeline beside this section highlights the timing of each cash movement.
05. Time value of money: why ₹1 tomorrow is different
A rupee available today can be invested, so a rupee expected later is not automatically equivalent. Risk and inflation may also matter when selecting a suitable discount rate, but the calculation must avoid double-counting risk adjustments. The present value of a future receipt is FV ÷ (1 + r)^n, where r is the rate per period and n is the number of periods.
At 12%, ₹15 lakh arriving after one year has present value 15/1.12 = ₹13.393 lakh. The ₹18 lakh arriving after two years has present value 18/1.12² = ₹14.349 lakh. A longer wait means a larger discount when the rate is positive. The discount rate is a required return or hurdle rate appropriate to the project and its cash-flow definition; it is not automatically equal to the borrowing rate. The same discounting logic appears in bonds, annuities, leases and investment decisions.
Try it yourself: Present value
06. Simple payback period
The payback period tells us how long it takes cumulative undiscounted cash inflows to recover the initial outlay. It is easy to explain and useful as a supplementary liquidity indicator, but it ignores the time value of money and cash flows after recovery.
Asha Packaging starts at −₹50 lakh. After year one, ₹35 lakh remains unrecovered. After year two, ₹17 lakh remains. Year three provides ₹20 lakh, so recovery occurs during year three. Assuming the year-three cash is earned evenly during that year, payback = 2 + 17/20 = 2.85 years. If cash arrives only at year-end, this fractional interpolation is only an approximation; the exact point of recovery is the end of year three. Never confuse payback with the period of the bank's loan or treat a shorter payback as proof of positive NPV.
Try it yourself: Simple payback
07. Discounted payback period
Discounted payback accumulates the present values of future cash inflows rather than their nominal amounts. It recognises time value but still ignores cash flows after the recovery point. At 12%, Asha Packaging's discounted year-one inflow is ₹13.393 lakh, year-two ₹14.349 lakh and year-three ₹14.236 lakh. After three years, approximately ₹42.0 lakh of present value has been recovered, leaving about ₹8.0 lakh. Year-four discounted inflow is about ₹15.888 lakh. Therefore discounted payback is approximately 3.50 years, assuming interpolation within year four.
Discounted payback cannot replace NPV: a project with valuable late cash flows might look unattractive under a rigid recovery cut-off. Use it as a complementary indicator of recovery timing and exposure, not as the sole investment rule.
08. Net present value: the central investment rule
Net present value (NPV) is the present value of incremental future project cash inflows minus the initial investment. With annual end-of-year flows: NPV = −I₀ + Σ CFₜ/(1+r)^t. If the chosen discount rate properly represents the required return and cash flows are correctly estimated, NPV > 0 means the project is expected to add economic value; NPV = 0 means it just earns the required return; NPV < 0 means it fails the hurdle.
For Asha Packaging at 12%, discounted inflows are approximately ₹13.393, ₹14.349, ₹14.236 and ₹15.888 lakh. Their total is ₹57.866 lakh, giving NPV ≈ +₹7.866 lakh after deducting the ₹50-lakh outlay. This is an economic surplus, not the project's cash balance or accounting profit. The calculator lets candidates vary the discount rate and annual inflows. Watch the NPV move toward zero as the required return increases for a conventional project with one initial outflow followed by positive receipts.
Try it yourself: Net present value
09. NPV decision under capital rationing
When a firm can fund every independent positive-NPV project, accepting them may maximise value under the assumptions used. But a bank or company may face capital rationing: limited funds mean not every attractive project can be financed. Ranking projects solely by NPV or solely by profitability index can be misleading when projects have different sizes or are indivisible.
Suppose Project A requires ₹50 lakh and offers NPV ₹8 lakh; Project B requires ₹20 lakh and offers NPV ₹5 lakh. B has a higher NPV per rupee invested, but A creates more absolute value. With a ₹50-lakh funding limit, one might compare feasible combinations, not blindly choose the highest ratio. For mutually exclusive projects, the one with the higher NPV at an appropriate common basis generally deserves preference, subject to risk, strategic constraints and differences in project lives.
10. Internal rate of return: the break-even discount rate
The internal rate of return (IRR) is the discount rate at which the project's NPV equals zero. It is an implied rate of return on the modeled cash-flow sequence, not a guaranteed deposit interest rate. For Asha Packaging, solving −50 + 15/(1+IRR) + 18/(1+IRR)² + 20/(1+IRR)³ + 25/(1+IRR)⁴ = 0 gives an IRR of approximately 18.67%. Because this exceeds the illustrative 12% required return, the conventional project passes the IRR test.
There is no need to memorise a complicated algebraic solution. A trial-and-error or numerical root-finding method changes the discount rate until NPV is almost zero. The interactive IRR tool uses a bracketed numerical method for the conventional example and shows the rate together with the residual NPV. IRR and NPV usually agree on accept/reject for a conventional independent project, but they can rank mutually exclusive projects differently.
Try it yourself: Internal rate of return
11. IRR limitations and multiple roots
IRR can mislead when cash-flow signs change more than once. For example, a mining project may pay an initial cost, earn cash and later pay a large restoration cost. Such non-conventional cash flows can produce more than one IRR or no economically useful IRR. Even for conventional projects, an exceptionally high IRR on a tiny investment may add less absolute value than a larger project with a lower IRR.
The textbook claim that IRR assumes reinvestment at the IRR is a common interpretation, but it should not be treated as the sole reason for preferring NPV. NPV explicitly values cash flows using a consistent required-return assumption. When NPV and IRR conflict for mutually exclusive investments, examine project scale, timing, lives and discount-rate assumptions; NPV is generally the more reliable value criterion.
12. Profitability index
The profitability index (PI) is PV of future cash inflows ÷ initial investment for a conventional single initial outlay. A PI greater than 1 corresponds to positive NPV, because PV of inflows exceeds the cost. For Asha Packaging, PI = 57.866/50 ≈ 1.157. This means the project produces about ₹1.157 of present value for each ₹1 invested. The excess ₹0.157 is present-value surplus, not a 15.7% annual return.
A high PI is useful when screening projects under a budget constraint, but it does not by itself select the best feasible portfolio of indivisible projects. Be careful if investments are spread over several periods: the denominator must then reflect an appropriate present-value treatment of outflows.
Try it yourself: Profitability index
13. Accounting rate of return and its limits
The accounting rate of return (ARR) compares accounting profit with a defined investment base. Textbooks use different conventions, such as average annual profit divided by average investment or initial investment. The denominator must be stated before computing the answer. ARR is simple but relies on accounting profit rather than project cash flow and does not discount distant returns.
Suppose a ₹40-lakh asset has zero residual value, a four-year life and straight-line depreciation of ₹10 lakh per year. If average annual accounting profit after depreciation and tax is ₹6 lakh, and the chosen denominator is average book investment of ₹20 lakh, ARR = 6/20 = 30%. If a question instead specifies initial investment, the result becomes 15%. This difference is a definition issue, not an arithmetic error.
14. Sensitivity analysis: which assumption matters most?
An NPV figure is only as reliable as its inputs. Sensitivity analysis changes one input at a time (for example, sales volume, material cost, discount rate or project life) to show how strongly the result responds. Scenario analysis changes several related inputs together, such as lower demand and slower collections in a downturn. Neither method assigns probabilities automatically; a probability-weighted expected NPV requires additional assumptions.
If Asha Packaging's year-two inflow falls from ₹18 lakh to ₹12 lakh, the NPV decreases by ₹6/1.12² ≈ ₹4.783 lakh, to roughly ₹3.083 lakh. The project may remain positive-NPV, but its safety margin narrows. A banker should investigate how cash generation changes if utilisation, input prices or customer payments depart from the base case.
15. Term loan: match financing to asset life
A term loan generally finances capital expenditure and is repaid according to an agreed schedule rather than revolving like a cash-credit facility. The borrower normally contributes a margin or promoter equity, while the lender assesses project cost, implementation schedule, cash-flow generation, repayment capacity, security, covenants and other credit risks. The bank may disburse in stages against milestones and documentary evidence.
For example, a ₹50-lakh project could be funded by ₹20 lakh promoter contribution and ₹30 lakh term loan. This funding mix does not change the unlevered project's initial ₹50-lakh economic cost. But it changes cash available to equity holders and the scheduled payments that the borrower must make. The lender should not simply use the project's IRR as evidence that every quarterly instalment will be paid.
16. Reducing-balance EMI: how the instalment works
For a fully amortising loan with equal instalments and a fixed rate per instalment period, EMI = P × i × (1+i)^n / [(1+i)^n − 1], where P is principal, i is the periodic rate and n is the number of instalments. The numerically stable equivalent is P × i / [1 − (1+i)^−n]. When i = 0, EMI = P/n.
Consider ₹30 lakh borrowed at a nominal annual rate of 12%, repaid in 60 monthly instalments, with a simplifying monthly rate of 1%. The EMI is approximately ₹66,733 per month. In month one, interest is ₹30,000 and principal repayment is approximately ₹36,733. In month two, interest is calculated on the lower outstanding balance. As the loan amortises, the interest component declines and the principal component rises. Actual bank schedules can differ because of day-count conventions, floating rates, moratoriums, fees and disbursement timing.
Try it yourself: Loan EMI
17. Moratorium, interest during construction and repayment design
A moratorium may defer principal repayment during construction or stabilisation. It does not automatically waive interest. If interest is capitalised during construction, the outstanding principal can increase; if interest is serviced separately, the cash-flow burden starts earlier. Banks assess whether the proposed moratorium is consistent with commissioning dates and expected ramp-up of cash flows.
Suppose ₹30 lakh is outstanding for six months at a simple illustrative rate of 12% per annum. If no principal is repaid and interest is capitalised using a simplified simple-interest approach, accumulated interest is ₹30 × 12% × 6/12 = ₹1.8 lakh. The subsequent repayment base could become ₹31.8 lakh if the contract capitalises this amount. This is an illustration only: actual compounding, capitalisation, disbursement stages and repayment obligations follow the sanctioned terms.
18. Debt service coverage ratio (DSCR)
DSCR asks whether cash available for debt service is sufficient to meet contractual principal and interest obligations over a defined period. A simplified expression is cash available for debt service (CFADS) ÷ (scheduled principal + interest). Different banks and appraisal formats may use specific definitions and adjustments; candidates must follow the definition stated in a question.
If annual CFADS is ₹18 lakh, scheduled principal repayment is ₹10 lakh and interest due is ₹3 lakh, DSCR = 18/(10+3) = 1.385 times. A DSCR of 1.385 means ₹1.385 of available cash for each ₹1 due under this definition. It does not imply ₹1.385 of accounting profit. If CFADS drops to ₹11 lakh with the same debt service, DSCR becomes 0.846, signalling a shortfall. No universal threshold guarantees approval; lenders consider business risk, sector, security, volatility and internal policy.
Try it yourself: Debt service coverage ratio
19. Why positive NPV does not guarantee repayment
NPV aggregates discounted cash flows across the project's full life. Debt repayment is date-specific. A project could generate strong cash in years three and four yet face a large instalment in year one before customers start paying. A banker therefore needs both project viability analysis and period-wise cash-flow / debt-service analysis.
Imagine a project with a positive ₹8-lakh NPV but year-one CFADS of ₹5 lakh against ₹8 lakh of scheduled debt service. The year-one DSCR is 0.625, showing a cash deficit despite positive overall value. Possible responses include reviewing the repayment profile, promoter support, contingency funding, working-capital arrangements or project risk; they are not automatic approvals. Never use a high IRR as a substitute for analysing the timing and reliability of debt service.
20. Integrated appraisal: banker’s checklist
A practical term-loan appraisal brings the concepts together. First, establish total project cost, implementation period and promoter contribution. Second, verify assumptions on capacity, sales, operating costs, taxes, maintenance and working capital. Third, build incremental project cash flows and calculate NPV, IRR, PI and payback. Fourth, test downside cases and identify the assumptions with the greatest impact. Fifth, map disbursements, interest, moratorium and instalments into period-wise cash flow. Sixth, calculate DSCR and review repayment sensitivity. Seventh, examine borrower conduct, management, security, regulatory compliance and bank policy.
Asha Packaging has an illustrative positive NPV of about ₹7.866 lakh and an IRR above its 12% hurdle, but that is only the investment appraisal. To reach a lending decision, a bank still needs verified projections, loan terms, period-wise CFADS and risk assessment. This distinction is the central practical lesson of the chapter.
21. Common mistakes and examination method
Mistake 1: Discounting the initial outlay at t = 1 instead of leaving it at t = 0. Mistake 2: Treating depreciation as a cash outflow and forgetting its tax effect. Mistake 3: Excluding salvage proceeds or recovery of working capital from terminal cash flow. Mistake 4: Using accounting profit in an NPV calculation when the question asks for cash flows. Mistake 5: Using a monthly rate with annual cash flows. Mistake 6: Treating payback as a value-maximisation measure. Mistake 7: Believing IRR always has a unique answer. Mistake 8: Confusing loan instalments with total project costs. Mistake 9: Mixing principal and interest incorrectly in DSCR. Mistake 10: Claiming that positive NPV guarantees sufficient cash for every debt-service date.
Exam workflow: draw the timeline; mark the cash-flow signs; identify the relevant rate and period; decide whether the question asks for payback, PV, NPV, IRR, PI, EMI or DSCR; calculate; check units and timing; then interpret the result in one plain-English sentence. An answer without interpretation is often incomplete in a practical banking context.
Practise: 25 explained MCQs
Choose an option to reveal the answer and reasoning. Questions are original and specific to this chapter.
P3C07: Capital Investment Decisions / Term Loans
Learn with cash-flow diagrams, editable calculators and explained practice questions.
Chapter practice
This practice is separate from timed mock tests. Answers and explanations appear after you choose an option.
Your reading progress
Sign in to save your progress across devices.